BI slug set was working the Wilton Local Feb. 25th. By: Andy Brown
|
|
|
Tie train arrives at Stockton to unload ties, Feb. 27, 2013. By: Andy Brown
|
|
Tie train is clearing up at the west end of Twin States. By: Andy Brown
|
|
EB crosses the small bridge on Twin States siding and meets the tie train. By: Andy Brown
|
BI slug set was working the Wilton Local Feb. 25th.
25Feb2013 010
25Feb2013 014
Tie train arrives at Stockton to unload ties, Feb. 27, 2013.
27Feb2013 004
Tie train is clearing up at the west end of Twin States.
A late EB is passing Twin States.
EB crosses the small bridge on Twin States siding and meets the tie train.