Office Car Special approaches the 217.75 crossing west of Atalissa, April 29, 2008. By: Andy Brown
|
|
|
OCS on the Cedar River bridge, April 29, 2008. Observant river watchers will notice that the water level is quite high! By: Andy Brown
|
|
|
|
Due to the train's high speed I wasn't able to get zoomed out and focused in time and screwed this shot up. By: Andy Brown
|
Stopped at Atalissa to inspect the track machinery. By: Andy Brown
|
Mr. Posner always has time for his fans. By: Andy Brown
|
Newly arrived panel switch for the Atalissa spur. By: Andy Brown
|
|
All aboard for departure from Atalissa. By: Andy Brown
|
|
|
Westbound arrives to hold at N. Star, April 30, 2008. By: Andy Brown
|
East train heads in at the west end of N. Star siding. By: Andy Brown
|
|
|
Does anyone out there NOT like 400? After backing out the west end, the east train pulls up the main under the Wilton overpass, April 30, 2008. By: Andy Brown
|
|
Setting scrap to the siding, the conductor makes the cut behind the Davenport loads. By: Andy Brown
|
Putting the Davenport loads back onto the train. By: Andy Brown
|
|
|
East train is ready to depart N. Star, April 30, 2008. By: Andy Brown
|
Office Car Special approaches the 217.75 crossing west of Atalissa, April 29, 2008.
April 29-30, 2008. 003
Going away shot.
OCS on the Cedar River bridge, April 29, 2008. Observant river watchers will notice that the water level is quite high!
OCS at Durant, April 30, 2008.
Heading west.
Wilton overpass.
Due to the train's high speed I wasn't able to get zoomed out and focused in time and screwed this shot up.
Stopped at Atalissa to inspect the track machinery.
Mr. Posner always has time for his fans.
Newly arrived panel switch for the Atalissa spur.
Nice drumhead!
All aboard for departure from Atalissa.
West Liberty.
April 29-30, 2008. 037
Westbound arrives to hold at N. Star, April 30, 2008.
East train heads in at the west end of N. Star siding.
Pulling eastward up the siding.
West train leaves N. Star.
Does anyone out there NOT like 400? After backing out the west end, the east train pulls up the main under the Wilton overpass, April 30, 2008.
April 29-30, 2008. 082
Setting scrap to the siding, the conductor makes the cut behind the Davenport loads.
Putting the Davenport loads back onto the train.
Setting 400 over to the siding.
April 29-30, 2008. 096
East train is ready to depart N. Star, April 30, 2008.