|
The westbound's crew has cut the power off their train and put it on the siding; the eastbound crew has cut off their 4 lead units and is tying onto the west train. Feb. 8, 2007. By: Andy Brown
|
The RI crew has tied their 4 700s onto the head end of the east train and is pulling into the siding, while the westbound crew waits for them to clear. Feb. 8, 2007. By: Andy Brown
|
West train at Midway Hill east of Iowa City. By: Andy Brown
|
|
Iowa City lineup: The westbound's setout (mostly CR stuff) is on the main, west train (468) is on the siding, CR job's power is on 1 track, and the roundhouse crew is moving 718 from 5 to 4 track. Feb. 8, 2007. By: Andy Brown
|
West train at Wilton, Feb. 8, 2007.
The westbound's crew has cut the power off their train and put it on the siding; the eastbound crew has cut off their 4 lead units and is tying onto the west train. Feb. 8, 2007.
The RI crew has tied their 4 700s onto the head end of the east train and is pulling into the siding, while the westbound crew waits for them to clear. Feb. 8, 2007.
West train at Midway Hill east of Iowa City.
Interesting pig on the westbound.
Iowa City lineup: The westbound's setout (mostly CR stuff) is on the main, west train (468) is on the siding, CR job's power is on 1 track, and the roundhouse crew is moving 718 from 5 to 4 track. Feb. 8, 2007.