The east train comes into Iowa City with 153 in the lead By: NDHolmes
|
IAIS 153 and the east train continuing east near the Cedar River By: NDHolmes
|
The east train (CBBI) meets the RIIC turn at Wilton By: NDHolmes
|
The SmartStart automatic shutdown is just eerie - it's strange to be standing next to two huge diesels and just have them shut off By: NDHolmes
|
The turn swapped out IAIS 154 for IAIS 719 on the work train. Here's 719 ducking out onto the main to swap cars around - something about not having the right air hoses in the right places. By: NDHolmes
|
There's something you don't see every day - three SD38-2s running backwards on the mainline. By: NDHolmes
|
The last unpainted unit on the railroad - IAIS 154. With the ES44s on the property, will it ever get painted? By: NDHolmes
|
Two sticks of CWR at Atalissa - 115 pound, rolled in Pueblo, CO, and installed in 2005. Just amazing how much the track has improved in the last few years. By: NDHolmes
|
IAIS 151 passing the West Liberty depot By: NDHolmes
|
IAIS 719 and work train back out on the main and loading rock near the Wendling Quarry. By: NDHolmes
|
The east train comes into Iowa City with 153 in the lead
IAIS 153 and the east train continuing east near the Cedar River
The east train (CBBI) meets the RIIC turn at Wilton
The SmartStart automatic shutdown is just eerie - it's strange to be standing next to two huge diesels and just have them shut off
The turn swapped out IAIS 154 for IAIS 719 on the work train. Here's 719 ducking out onto the main to swap cars around - something about not having the right air hoses in the right places.
There's something you don't see every day - three SD38-2s running backwards on the mainline.
The last unpainted unit on the railroad - IAIS 154. With the ES44s on the property, will it ever get painted?
Two sticks of CWR at Atalissa - 115 pound, rolled in Pueblo, CO, and installed in 2005. Just amazing how much the track has improved in the last few years.
IAIS 151 passing the West Liberty depot
IAIS 719 and work train back out on the main and loading rock near the Wendling Quarry.