Looking east at the Anchor Lumber switch, you can see the ground has been graded for the 2nd siding to be placed between the current mainline and siding. The mainline siding will be extended east to the road crossing at Carbon Cliff. May 23, 2006. By: Erik Rasmussen
|
Looking west from the grade crossing in Carbon Cliff, IL. The graded area on the north side of the mainline will be the new siding. April 28, 2006. By: Erik Rasmussen
|
Looking east at Carbon Cliff, IL at the distant signal for the junction at Colona. April 28, 2006. By: Erik Rasmussen
|
|
|
|
|
|
|
|
Positioning the new ties with a backhoe. June 21, 2006. By: Erik Rasmussen
|
Laying down new ties with a tie crane. June 23, 2006. By: Erik Rasmussen
|
|
|
Looking east at the Anchor Lumber switch, you can see the ground has been graded for the 2nd siding to be placed between the current mainline and siding. The mainline siding will be extended east to the road crossing at Carbon Cliff.
May 23, 2006.
Looking west from the grade crossing in Carbon Cliff, IL. The graded area on the north side of the mainline will be the new siding.
April 28, 2006.
Looking east at Carbon Cliff, IL at the distant signal for the junction at Colona.
April 28, 2006.
@ West Switch Silvis.
June 18, 2006.
New 115# rail.
June 18, 2006.
Switch gear at NRE's entrance.
June 18, 2006.
@ Anchor Lumber switch.
June 18, 2006.
Looking east from IL Hwy-5.
June 18, 2006.
Looking west from IL Hwy-5.
June 18, 2006.
@ Carbon Cliff.
June 18, 2006.
Positioning the new ties with a backhoe.
June 21, 2006.
Laying down new ties with a tie crane.
June 23, 2006.
L.A. Colo equipment.
June 23, 2006.
L.A. Colo track mobile.
June 23, 2006.