WB heads in at the east end of N. Star to clear up behind the coal train. By: Andy Brown
|
I like these CEFXs with the black body. By: Andy Brown
|
Darren has 2 more loads for his transload at West Lib. By: Andy Brown
|
|
EB RI turn arrives at the ramp with Darren's lumber loads, Oct. 2, 2010. By: Andy Brown
|
|
|
|
|
|
|
|
|
WB heads in at the east end of N. Star to clear up behind the coal train.
I like these CEFXs with the black body.
Darren has 2 more loads for his transload at West Lib.
EB is ready to go.
EB RI turn arrives at the ramp with Darren's lumber loads, Oct. 2, 2010.
Oct. 2, 2010 027
Oct. 2, 2010 028
Oct. 2, 2010 029
Oct. 2, 2010 030
Oct. 2, 2010 035
Oct. 2, 2010 036
Oct. 2, 2010 039
Oct. 2, 2010 040