Album: 08/30/11 Progress Report

While the highway fills have a smooth, man-made look the Hickman underpass has more of a rough and weathered feel to it. The abutments were carved and set in place and will be back-filled with joint compound and scenic material. The center pier will be set in place once the road locations are finalized.
By: James McNab

Album: IAIS-Based Layouts navigate UP Album: James McNab's Grimes Line navigate UP Album: Progress Photos navigate UP Album: 08/30/11 Progress Report navigate UP (accesskey 'U')
While the highway fills have a smooth, man-made look the Hickman underpass has more of a rough and weathered feel to it.  The abutments were carved and set in place and will be back-filled with joint compound and scenic material.  The center pier will be set in place once the road locations are finalized.
First Photo (Accesskey 'F') Previous Photo (Accesskey 'P') 3 of 6 Next Photo (Accesskey 'N') Last Photo (Accesskey 'L')
Jump to:
All images on this site are copyrighted by their respective creators, and used with permission.
All Iowa Interstate logos and trademarks are property of Iowa Interstate Railroad, Ltd. and Railroad Development Corporation.
Questions? Comments? Please email us at contact@iaisrailfans.org
  Last modified on April 26, 2010, at 11:40 PM