WB turn north of Wending's Quarry (that's the quarry's overburden pile in the background), mp 213.2. Aug. 17, 2005 By: Andy Brown
|
WB turn at N. Star west switch, Aug. 25, 2005. By: Andy Brown
|
Setting out the N. Star swich engine, Aug. 25, 2005. By: Andy Brown
|
WB turn at the Wilton overpass, Aug. 30, 2005. By: Andy Brown
|
WB turn at the Wilton overpass, with the balance of the coal train near the head end. Aug. 31, 2005. By: Andy Brown
|
Behind the coal, ballast. Aug. 31, 2005. By: Andy Brown
|
And farther back, new ties. Aug. 31, 2005. By: Andy Brown
|
WB turn north of Wending's Quarry (that's the quarry's overburden pile in the background), mp 213.2. Aug. 17, 2005
WB turn at N. Star west switch, Aug. 25, 2005.
Setting out the N. Star swich engine, Aug. 25, 2005.
WB turn at the Wilton overpass, Aug. 30, 2005.
WB turn at the Wilton overpass, with the balance of the coal train near the head end. Aug. 31, 2005.
Behind the coal, ballast. Aug. 31, 2005.
And farther back, new ties. Aug. 31, 2005.