06/20/11 Progress Report
Album: IAIS-Based Layouts navigate UP Album: James McNab's Grimes Line navigate UP Album: Progress Photos navigate UP (accesskey 'U')
The backdrop has been painted and fluorescent lighting installed around the perimeter.
The backdrop has been painted and fluorescent lighting installed around the perimeter.
By: James McNab
Based on recommendations from the ProtoLayout list, Behr "Nevada Sky" was used for the backdrop.  The color does a good job of simulating a midwestern sky with just a hint of haze.
Based on recommendations from the ProtoLayout list, Behr "Nevada Sky" was used for the backdrop. The color does a good job of simulating a midwestern sky with just a hint of haze.
By: James McNab
Lighting has yet to be installed over the peninsulas.  I'm still figuring out how to best hang the valance in the middle of the room.
Lighting has yet to be installed over the peninsulas. I'm still figuring out how to best hang the valance in the middle of the room.
By: James McNab
Hardware for the DCC mount has arrived.  The command station will be mounted in a drawer underneath the staging/fiddle yard.
Hardware for the DCC mount has arrived. The command station will be mounted in a drawer underneath the staging/fiddle yard.
By: James McNab
IAIS 603 pulls a load of lumber to Beisser in Grimes.
IAIS 603 pulls a load of lumber to Beisser in Grimes.
By: James McNab
5 images in this album.
[Login]
All images on this site are copyrighted by their respective creators, and used with permission.
All Iowa Interstate logos and trademarks are property of Iowa Interstate Railroad, Ltd. and Railroad Development Corporation.
Questions? Comments? Please email us at contact@iaisrailfans.org
  Last modified on January 29, 2015 at 16:15.