06/13/11 Progress Report
Album: IAIS-Based Layouts navigate UP Album: James McNab's Grimes Line navigate UP Album: Progress Photos navigate UP (accesskey 'U')
Backdrop is in place on the Grimes Line.  Aluminum trim coil surrounds the outer walls but the peninsulas are open to allow access for switching operations.
Backdrop is in place on the Grimes Line. Aluminum trim coil surrounds the outer walls but the peninsulas are open to allow access for switching operations.
By: James McNab
Aluminum trim coil can crease easily but provides a seamless and consistent surface.
Aluminum trim coil can crease easily but provides a seamless and consistent surface.
By: James McNab
The hardboard skirting is in place around the entire layout.  The seams are taped and will be covered with joint compound.
The hardboard skirting is in place around the entire layout. The seams are taped and will be covered with joint compound.
By: James McNab
Peninsula legs were wrapped with hardboard and trimmed out.
Peninsula legs were wrapped with hardboard and trimmed out.
By: James McNab
A test piece of the fascia is installed on the Grimes peninsula.  Contours will be carved once the track locations are finalized.
A test piece of the fascia is installed on the Grimes peninsula. Contours will be carved once the track locations are finalized.
By: James McNab
The first of the planned 10 light fixtures is in place over the staging/fiddle yard.  An 8 inch valance will cover the lighting strip.
The first of the planned 10 light fixtures is in place over the staging/fiddle yard. An 8 inch valance will cover the lighting strip.
By: James McNab
6 images in this album.
[Login]
All images on this site are copyrighted by their respective creators, and used with permission.
All Iowa Interstate logos and trademarks are property of Iowa Interstate Railroad, Ltd. and Railroad Development Corporation.
Questions? Comments? Please email us at contact@iaisrailfans.org
  Last modified on January 29, 2015 at 16:15.