Basic scenery and landforms are now complete on my Grimes Line layout By: James McNab
|
|
Corner #1 - Future site of the I-235 overpass. The road on the left side is NW 86th Street. By: James McNab
|
The new scenery on the Urbandale runaround. This area will feature a lot of trees when completed. By: James McNab
|
Corner #3 - between Beisser Lumber and Geneser Feed in Grimes, still under scenic construction. A partially plowed cornfield will be here. By: James McNab
|
An overall shot of Grimes. Compare this shot with the one in the benchwork album. By: James McNab
|
Each town features an track diagram showing spots and industries, as well as car car boxes for waybills, to assist operators. By: James McNab
|
IAIS 603 picks up a bulkhead flat at CB&I in Clive. By: James McNab
|
Basic scenery and landforms are now complete on my Grimes Line layout
West Des Moines - Wheeler Lumber
Corner #1 - Future site of the I-235 overpass. The road on the left side is NW 86th Street.
The new scenery on the Urbandale runaround. This area will feature a lot of trees when completed.
Corner #3 - between Beisser Lumber and Geneser Feed in Grimes, still under scenic construction. A partially plowed cornfield will be here.
An overall shot of Grimes. Compare this shot with the one in the benchwork album.
Each town features an track diagram showing spots and industries, as well as car car boxes for waybills, to assist operators.
IAIS 603 picks up a bulkhead flat at CB&I in Clive.